Quick reference
Ten days, three no-go conditions, one written decision.
Define: Decide before the demo
- Write the decision — What changes if this passes, in one sentence.
- Name the exit criteria — Three measurable no-go conditions, agreed in writing.
- Fix the data set — Synthetic or masked, at production size.
Run: Two weeks, nothing open ended
- Timebox the trial — Ten working days, one owner on each side.
- Test the boring paths — SSO, SCIM, export and the error states.
- Log every workaround — Each one is a cost you pay after signing.
Decide: Score it against the criteria
- Score against the sheet — Pass or fail first, then the nice-to-haves.
- Walk the exit — Ask for a sample export before you sign.
- Write the no — A clear no with reasons is a result.
In one line: A proof of concept without exit criteria is a demo. Decide what no looks like before the first login.
Write three nos:
poc/exit-criteria.mdExplained
Define
Write the decision first: what changes if this passes, in one sentence. Then three measurable no-go conditions, agreed in writing by both sides. Fix the data set, synthetic or masked, at production size, because a demo on ten rows tests nothing.
Run
Ten working days, one owner on each side, no open-ended extension. Test the boring paths: SSO, SCIM, export, error states and the support handoff. Log every workaround, because each one becomes your process after signing. If the vendor cannot give you the export schema during the trial, that is a finding, not a follow-up.
Decide
Score against the sheet, pass or fail first, then the nice-to-haves. Walk the exit before you sign: ask for a sample export and read its schema. And write the no when the criteria say no, because a clear no with reasons is a result.
The honest caveat: vendors behave differently in a paid trial with a deadline than in a free pilot with none.
Your turn: What would make you say no to your current shortlist?
Related on this site
More notes: Vendors & contracts
- P1051Licence management in six numbers
- P1050Five questions before you sign
- P1049Vendor exit and data export
- P1048Identity integration: SSO, SCIM, roles, offboarding
- P1047Four SLA numbers that matter
- P1046Data processing terms for engineers
- P1044Five red flags in a vendor contract
- P1043A security questionnaire that gets real answers
Open in the notes app: search, filters, copy This note on GitHub