Filters
How to search
  • Plain words find names, texts and examples.
  • "two words" finds the exact phrase.
  • --name or -x finds an option.
  • #word looks only inside commands.
  • @grep finds lessons and labs that use grep.
  • Filters: cat:network · in:labs · in:notes · level:rhcsa · ch:8 · root:yes. Put ! before a word to leave it out. OR between words means one of them.
  • ↑ ↓ to move · Enter to open · Esc to close · / to search

Platform operationsMixed 24 series

The change pipeline: propose, review, pilot, roll out

Most change problems are not technical. They are a pipeline with missing gates.

Quick reference

Four gates, each one able to say no before the change reaches everyone.

  1. Propose — One page: what changes, why now, who is affected, how to undo.
  2. Review — A second pair of eyes on the blast radius, not on the formatting.
  3. Pilot — One tenant or one percent, with the same checks as production.
  4. Roll out — Widen in steps, watching the same numbers that passed the pilot.
  5. Learn — Record what surprised you, then delete the flags that remain.

In one line: A change is a series of small promises. Each gate is a chance to stop cheaply, before the expensive part.

Draft the rfc:

gh pr create --draft --fill

Explained

Propose on one page: what changes, why now, who is affected, how you will know it worked and how you undo it. If the page cannot be written, the change is not ready for review, only for enthusiasm.

Review looks at the blast radius, not the formatting. A second pair of eyes should ask what breaks if this is wrong, which customers see it, and whether the rollback has been run. Approval without those three answers is a signature, not a review.

Pilot on one tenant or one percent, with the same checks as production. A pilot that passes with different dashboards, different data or a different deploy path has tested a different system.

Roll out in steps, watching the same numbers that passed the pilot. Widen only while they hold, and stop on a threshold written down in advance.

Learn at the end: what surprised you, which gate should have caught it, and which flags are still on. A change that leaves three flags behind has not finished.

The honest caveat: gates add latency, and a pipeline with too many of them teaches people to batch changes, which makes each one riskier.

Your turn: Which gate in your pipeline has actually said no this quarter?

More notes: Platform operations

Open in the notes app: search, filters, copy This note on GitHub