Quick reference
- Adoption: the share of eligible teams on the golden path, measured weekly.
- Lead time: merge to production, at the median and the p90.
- Support load: tickets per served team, split by cause.
- Cost per team: run cost over teams served, excluding migrations.
Explained
Adoption. The share of teams that could use the golden path and actually do, measured weekly. Not the number of logins to the portal. A platform with high adoption and low satisfaction is a monopoly; one with low adoption and high satisfaction is a pilot.
Lead time. Merge to production for a team on the platform, reported at the median and the p90. The median hides the queue; the p90 is what a new team actually experiences.
Support load. Tickets per served team per month, split into questions, bugs and access requests. A flat line while adoption grows is a good sign. A falling line usually means the docs improved, not that the platform did.
Cost per team. Total platform run cost divided by the teams actually served, excluding one-off migrations. It is a rough number, and the trend is more useful than the value.
The honest caveat: all four can be gamed by choosing the denominator. Write the definition next to the number, or the number will be redefined in the meeting.
Your turn: Which of the four does your platform not measure?
Related on this site
More notes: Platform engineering
- P1121Three strategy questions (series close)
- P1120Five metrics that survive scrutiny
- P1119Saying no with evidence
- P1118Pricing an internal platform: cost, chargeback, showback
- P1116Deprecation without breaking everyone
- P1115Versioning an internal API: add, announce, retire
- P1114Five ways platforms fail their users
- P1113Platform as a product
Open in the notes app: search, filters, copy This note on GitHub