Quick reference
The full script is at the end of this note: risk_score.py (standard library only, no pip install).
Run it
python3 risk_score.py register.json --appetite 15Example output
ALERT 1 over appetite 15
top 25 R-001 customer-apiExplained
What it does The script reads a JSON register, takes each risk's likelihood and impact on a 1 to 5 scale, multiplies them, and sorts the result from 25 down to 1. It prints the score, id, asset, owner and status, then compares every score with the appetite you pass on the command line. It is read-only: the register is never rewritten.
Why multiply Multiplication is crude and it is honest: a 5 by 5 is 25, a 4 by 4 is 16, and a 1 by 5 is 5. It forces the two arguments into one number, which is the only way a queue can be ordered. Ties break on id, so two runs agree.
Exit codes Zero means every risk is at or below the appetite; one means at least one is above it; two means the usage, the file or a field is wrong. Missing fields, a likelihood outside 1 to 5, or a duplicate id stop the run with exit 2 rather than a guess. That makes the script a CI step or a cron job, not just a report.
The honest caveat: the score knows nothing about status. An accepted risk still scores 20, so the status column is there for the human who has to argue with the number.
The lesson: a register that cannot fail a build is a diary.
In one line
Score the risk, then own it. A number ranks the queue; it does not assign the owner.
Run it in ci
python3 risk_score.py register.jsonScript: risk_score.py
Download: scripts/risk_score.py
#!/usr/bin/env python3
"""Score a JSON risk register and fail when a risk is over the appetite.
Usage:
python3 risk_score.py register.json
python3 risk_score.py register.json --appetite 12
python3 risk_score.py --help
The register is a JSON object with a "risks" list. A bare list also works.
Each risk needs: id, asset, likelihood (1-5), impact (1-5), owner, status.
The score is likelihood x impact, so it runs from 1 to 25. The script ranks
every risk, prints the table, and exits 1 when any score is above --appetite.
Exit codes:
0 every score is at or below the appetite
1 at least one score is above the appetite
2 usage error, unreadable file, invalid JSON or invalid field
The register is opened read-only and is never modified.
Cron/CI:
0 7 * * 1 python3 risk_score.py /etc/risk/register.json --appetite 15
python3 risk_score.py register.json --appetite 15 || exit 1
By s0sta.com
"""
import argparse
import json
import sys
from pathlib import Path
FIELDS = ("id", "asset", "likelihood", "impact", "owner", "status")
class RegisterError(Exception):
"""The register or one of its fields is not usable."""
def parse_args(argv=None):
parser = argparse.ArgumentParser(
description="Score a JSON risk register (likelihood x impact) and gate on an appetite.",
)
parser.add_argument("register", help="path to the JSON register")
parser.add_argument(
"--appetite",
type=int,
default=15,
metavar="N",
help="highest score allowed without failing, 1-25 (default: 15)",
)
return parser.parse_args(argv)
def load_register(path):
try:
raw = Path(path).read_text(encoding="utf-8")
except (OSError, UnicodeError) as exc:
raise RegisterError("cannot read %s: %s" % (path, exc))
try:
document = json.loads(raw)
except ValueError as exc:
raise RegisterError("invalid JSON in %s: %s" % (path, exc))
if isinstance(document, dict):
document = document.get("risks")
if not isinstance(document, list):
raise RegisterError('register must be a list or an object with a "risks" list')
return document
def validate(rows):
scored = []
seen = set()
for index, row in enumerate(rows, 1):
where = "risk %d" % index
if not isinstance(row, dict):
raise RegisterError("%s: expected an object" % where)
missing = [field for field in FIELDS if field not in row]
if missing:
raise RegisterError("%s: missing %s" % (where, ", ".join(missing)))
risk_id = row["id"]
if not isinstance(risk_id, str) or not risk_id.strip():
raise RegisterError("%s: id must be a non-empty string" % where)
if risk_id in seen:
raise RegisterError("%s: duplicate id %s" % (where, risk_id))
seen.add(risk_id)
for field in ("likelihood", "impact"):
value = row[field]
if isinstance(value, bool) or not isinstance(value, int) or not 1 <= value <= 5:
raise RegisterError("%s: %s must be an integer 1-5" % (where, field))
for field in ("asset", "owner", "status"):
if not isinstance(row[field], str) or not row[field].strip():
raise RegisterError("%s: %s must be a non-empty string" % (where, field))
scored.append(
{
"score": row["likelihood"] * row["impact"],
"id": risk_id,
"asset": row["asset"],
"owner": row["owner"],
"status": row["status"],
}
)
scored.sort(key=lambda item: (-item["score"], item["id"]))
return scored
def print_table(scored):
asset_width = max(len(item["asset"]) for item in scored)
owner_width = max(8, max(len(item["owner"]) for item in scored))
print("%5s %-8s %-*s %-*s %s" % (
"SCORE", "ID", asset_width, "ASSET", owner_width, "OWNER", "STATUS"))
for item in scored:
print("%5d %-8s %-*s %-*s %s" % (
item["score"], item["id"], asset_width, item["asset"],
owner_width, item["owner"], item["status"]))
def main(argv=None):
args = parse_args(argv)
if not 1 <= args.appetite <= 25:
print("risk_score.py: error: --appetite must be 1-25", file=sys.stderr)
return 2
try:
scored = validate(load_register(args.register))
except RegisterError as exc:
print("risk_score.py: error: %s" % exc, file=sys.stderr)
return 2
if not scored:
print("OK no risks in register")
return 0
print_table(scored)
over = [item for item in scored if item["score"] > args.appetite]
if over:
print("ALERT %d over appetite %d" % (len(over), args.appetite))
print("top %d %s %s" % (over[0]["score"], over[0]["id"], over[0]["asset"]))
return 1
print("OK %d risk%s, all at or below appetite %d" % (
len(scored), "" if len(scored) == 1 else "s", args.appetite))
return 0
if __name__ == "__main__":
sys.exit(main())More notes: Python scripts